29/01/2026
We recently completed the Hall Cross Academy/comprehensive/Grammar School Gym refurbishment in Doncaster, for Exceed Learning Partnership, working alongside architect, Building Link Design.
This project transformed a former squash court and disused garage into purpose-built school gym.
Project highlights include:
- Combining the old gym, squash courts, and a disused garage to create a single, spacious gym area.
- Installing 9m steel beams and reinforced goal posts to support the concrete roof.
- Laying a concrete engineered slab in the garage area and insulated the entire floor before installing chipboard flooring.
- Constructing fully insulated, plasterboarded, and decorated walls throughout.
- Fitting a new suspended ceiling, upgraded electrics, and installing air conditioning.
- Finishing with purpose-built gym flooring, ready for equipment and active use.
It was rewarding to create this modern gym space for Hall Cross School, supporting their students in physical development.