Healthy + High Performance Homes | Craftsmanship | Integrity
09/12/2025
Dramatic mid-framing night photo No. 1,980,563
08/12/2025
Throwback to one of our favorites.
06/12/2025
Grateful for amazing clients to work with, and for how this project has turned out.
30/11/2025
08/11/2025
Two benefits of the new Advantech X-Factor subfloor system: 1) Keep water out of the crawl space below, and 2) You can actually clean mud off the subfloor. Like we did today. Even better when your father lends a hand 😊
27/10/2025
‘Twas the night before move-in day…
06/10/2025
Flooring is finished. Busy next 3 weeks so the clients can move in.
24/09/2025
Almost 1000 CMU blocks, all for the crawl space piers. Leonard made a gravel bridge so the driver could haul them straight it. Crawl space walls about half-way stacked.
18/09/2025
Next up: Columns painted, 2nd coat Scuff X on interior trim
18/09/2025
Up next: 18-ft tall ICF walls. Footers: Fiberglass rebar + plastic fiber (no rust), 4000 psi mix, 10-in deep X 24-in wide
06/09/2025
Landscaping and exterior paint — all that’s left
04/09/2025
We have a couple more weeks before we need the final decision… but there is already a front runner