11/02/2026
🏫✨ New High School Construction Complete. Built for the Next Generation!
We’re proud to have played a key role in bringing this brand-new high school to life, outfitting the spaces that students and athletes will use every single day!
🔐 Phenolic & Metal Lockers + ADA Benches
Installed throughout athletic and student areas, these lockers combine strength and style.
• Phenolic lockers for moisture resistance and heavy locker room use
• Metal lockers for a clean, structured hallway look
• ADA benches to ensure accessibility and inclusivity
🏀 High-Performance Basketball Backstops
Engineered for safety, stability, and competitive-level play — ready for practice, game day, and everything in between.
🧵 Gym Divider Curtain
Instant space control! This system allows multiple activities to happen at once while maintaining safety, visibility, and smooth operation.
🛡 Custom Wall Padding
Installed for essential impact protection reducing injury risk while delivering a polished, professional finish to the gym.
Every detail was intentionally selected to create a facility that’s functional, resilient, and built to last.
We love being part of projects that help students learn, compete, and grow one school at a time.
📞 Call us at (770) 205-8312 to schedule your new construction consultation.
📧 Email info@hehodge.com
for questions, project planning, or to request a customized quote.