12/02/2026
4 days on this job up in seaton with over 50 lineal meters of 100mm edging welded in after the area was scratched out, then over 50 tonnes of 20mm crushed granite carted in, spread, shaped rolled and compacted to the correct height - all because this vision our clients had was turned into reality by us to enable plenty of yarns amongst family and friends around the new fire pit area, and some clean pathways leading to the deck and toilet areas.
Plus removing a concrete water tank, old veggie house, a load of steel from an old Avery, some old rubber mats and more Iβm sure Iβve forgotten to mention. Big job, with great end results - happy days π