Borger Cranes

Borger Cranes Borger Crane Hire and Rigging Service prides itself on personal attention and dedicated commitment to your lifting requirements.

We are at your service when you need a lift, contact us on our 24/7 booking hotline.

23/04/2026

๐Ÿ“บ WATCH NOW on Borger Cranes YouTube Channel
โžก๏ธ https://youtu.be/4YNTJLqDLPc?si=mN7mLpIkyp-3QyDR

Our Terex Demag CC2800 1600-ton crawler crane played a major role in the Penrith Stadium redevelopment. It helped John Holland install the new eastern grandstand roof, which is composed of 172 structural elements preassembled into 24-meter-long sections on the ground.
Some of these sections weigh up to 70 tons. This method improves safety, precision, and efficiency during installation.

The new welded-beam roof now covers more than half of the seats in the eastern grandstand, giving fans a much better matchday experience. Construction of the eastern grandstand seating has been completed, and work on the western grandstand roof has begun.

The redevelopment of Penrith Stadium is proudly funded by the New South Wales government.

A new video is coming...
20/04/2026

A new video is coming...

Behind the Lifts: Building Penrithโ€™s New Grandstand

15/04/2026

The very first job for our second of our new 480-tonne SANY Group crawler cranes, just a few weeks after arriving on Australian shores, was the installation of the first section of the pedestrian bridge at the future Loganlea Station (Queensland).

Weโ€™ll soon be taking you behind the scenes of this technically challenging project...

Thank you to Transport and Main Roads Queensland, Queensland Rail, Hanlon Industries and the Degnan Martinus JV project teams, along with all subcontractors involved, for their collaboration and commitment to delivering this important project.

Martinus Rail

01/04/2026

๐‘ฉ๐’๐’“๐’ˆ๐’†๐’“ ๐‘ช๐’“๐’‚๐’๐’†๐’” brings together over 1,000 people across the country, all united as โ€œ๐Žn๐ž ๐“e๐šm, ๐Žn๐ž ๐ƒr๐ža๐ฆโ€.
Our division managers play a key role in supporting this effort, helping teams stay aligned, communicate clearly and deliver safely for our customers every day.
With this collective strength, we are getting ready for an exciting new phase in 2026.

24/03/2026

When Pimpama Station on the Gold Coast Line (Queensland) was officially opened in October 2025, it brought back a whole host of memories. Borger Cranes had been involved in the project right from the start.

In our latest video, our site supervisor Luke Moroney tells us all about Borgerโ€™s work on this station.

๐‘พ๐’‚๐’•๐’„๐’‰ ๐’•๐’‰๐’† ๐’—๐’Š๐’…๐’†๐’ ๐’†๐’™๐’„๐’๐’–๐’”๐’Š๐’—๐’†๐’๐’š ๐’๐’ ๐’•๐’‰๐’† ๐‘ฉ๐’๐’“๐’ˆ๐’†๐’“ ๐‘ช๐’“๐’‚๐’๐’†๐’” ๐’€๐’๐’–๐‘ป๐’–๐’ƒ๐’† ๐’„๐’‰๐’‚๐’๐’๐’†๐’
https://www.youtube.com/watch?v=e5Jct7m1bp4

20/03/2026

Watch how a once-empty car park became the first new station on the South East Queensland rail network in nearly a decade.

From installing our LG750 to lifting a massive pedestrian overpass into place with ADCO, this video captures the key moments that reshaped the Gold Coast Line between Brisbane and the Coast.

Join site supervisor Luke Moroney on a walk-through of the finished Pimpama Station and see everything Borger Cranes helped bring to life.

๐–๐š๐ญ๐œ๐ก ๐ญ๐ก๐ž ๐ฏ๐ข๐๐ž๐จ ๐ž๐ฑ๐œ๐ฅ๐ฎ๐ฌ๐ข๐ฏ๐ž๐ฅ๐ฒ ๐จ๐ง ๐ญ๐ก๐ž ๐๐จ๐ซ๐ ๐ž๐ซ ๐‚๐ซ๐š๐ง๐ž๐ฌ ๐˜๐จ๐ฎ๐“๐ฎ๐›๐ž ๐œ๐ก๐š๐ง๐ง๐ž๐ฅ
https://www.youtube.com/watch?v=e5Jct7m1bp4

๐๐„๐– ๐•๐ˆ๐ƒ๐„๐Ž ๐Ž๐”๐“ ๐๐Ž๐–!!!!In April 2024, the LG750 was installed in the car park of the future Pimpama Station (Queensland). ...
19/03/2026

๐๐„๐– ๐•๐ˆ๐ƒ๐„๐Ž ๐Ž๐”๐“ ๐๐Ž๐–!!!!

In April 2024, the LG750 was installed in the car park of the future Pimpama Station (Queensland).

The biggest and most impressive part of this project was the installation of a pedestrian overpass connecting the two sides of the track. We carried out this project in partnership with ADCO to give a new dimension to the Gold Coast Line, linking Brisbane to the Gold Coast.
Pimpama Station is not just another station. It was the first new addition to the South East Queensland rail network in nearly a decade.

In October 2025, the station finally opened to the public. We returned to see everything Borber Cranes had achieved on site. Itโ€™s incredible to think that there used to be nothing here at all.
A tour of the site with Luke Moroney, the supervisor who managed the entire project.

In April 2024, the LG750 was installed in the car park of the future Pimpama Station (Queensland). The ground had been reinforced to ensure the craneโ€™s stabi...

11/03/2026

When we spoke to Shae-Anne, one thing she told us really stood out. When she said, โ€œIt's very cool to be part of something that not many women are part of,โ€ it really struck a chord with us. And she's absolutely right!

The industry has long been open to all kinds of profiles, and at Borger Cranes, we love having talent of this calibre.

Thank you, Shae-Anne, for choosing to work with us ๐Ÿ™

03/03/2026

Clean Up Australia Day may have been Sunday, 1 March 2026, but at Borger Cranes, we think about making our environment cleaner and safer every day
๐Ÿ‘ทโ€โ™‚๏ธ ๐Ÿ‘ท ๐Ÿงค

And as the boss always says: if you have time to lean, you have time to clean ๐Ÿ˜Š

Today we wanted to tell you about a Sunday morning, almost like any other for Borger Cranes. โ€˜Almostโ€™ because we spent i...
19/02/2026

Today we wanted to tell you about a Sunday morning, almost like any other for Borger Cranes. โ€˜Almostโ€™ because we spent it in the centre of Brisbane, surrounded by buildings. A section of the street was blocked off so that technical equipment could be hoisted onto the roof of a building... at a height of almost 100 metres in a very confined space.

Mitch ๐Ÿ’ช, one of our supervisors, worked for several months to ensure that this delicate operation ran smoothly and in record time to cause as little disruption as possible thanks to our expert teams ๐Ÿ’ช๐Ÿ’ช๐Ÿ’ช๐Ÿ’ช๐Ÿ’ช๐Ÿ’ช

The mission was accomplished perfectly (not surprising, right?). So we asked Mitch to tell us about his day's work in detail. Fascinating!

From traffic stoppage at 4 a.m. to last truck out at 4 p.m., follow a full mobileโ€‘crane lift day in Brisbane CBD: route planning, load charts, wind limits, m...

12/02/2026

Seeing the lift like the unit does ๐Ÿ‘€
On this Brisbane lift, the building was 26 meters away from the LTM 1350, the main boom was held at 82 degrees and the total reach was roughly 100 meters to clear 95 meters of structure plus about five meters of scaffolding...

If you have five minutes to spare, we have something that might interest you... ๐Ÿ“บ
31/01/2026

If you have five minutes to spare, we have something that might interest you... ๐Ÿ“บ

This isnโ€™t just another crane job. At QEII Coopers Plains, Borger Cranes and had to mobilise multiple cranes simultaneously, keep a hospital p...

Address

40 Kilto Crescent
Sydney, NSW
2761

Alerts

Be the first to know and let us send you an email when Borger Cranes posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to Borger Cranes:

Share