09/30/2025
The attached site update photos were provided today by Bird Construction. They show that the first and second floor hollow core is complete and grouted. As well, Bird is well underway with the third floor. They also poured the slab for the link between Dugald Estates and Dugald Place today, along with the pool building slab.😀