30/04/2026
A dam beautiful day for it😉
📍 Vyrnwy, Wales
It’s safe to say projects with views like this have the whole management team competing for site visits…
Works are now well underway at Vyrnwy. Having smashed through the downstream elevation survey (all 358lm of it😅) the team are already moving into the next phase of works.
What does that include?🤔
👉 Using our specialist rope access team and safe systems we will be carrying out masonry and mortar repairs to the eight turret roofs located along the dam wall.
Why rope access?🤔
👉 It allows us to complete the work with minimal disruption to the structure and its surroundings, leaving no trace other than a completed repair. These works are all part of maintaining/prolonging the life of this iconic structure.
As always, a huge shoutout to our on-site team for their outstanding work in protecting the safety and integrity of this Grade I listed structure👏
We’ll be sharing more stunning visuals as the team progresses through the works!
Want to learn more about our work on Grade I listed structures? Check out the link below 👇
https://www.verticalaccess.co.uk/case-studies/menai-bridge-inspection