08/03/2025
We are pleased to announce that further investment will be made in the gym in the coming weeks:
Starting on 19th March, the 'Top Section' adjacent to the free weights area will be temporarily closed for two days while the flooring is replaced to match the other areas.
In conjunction with this, we will be upgrading the following equipment:
- All of the old grey Technogym cable machines, including the radial fly in the free weights area, will be replaced with brand new machines from Matrix Fitness.
- A new attachment will be added to the 'Four Station' unit, converting it into a 'Five Station.'
- All dumbbells, ranging from 2.5kg to 50kg, will be replaced with new sets from Matrix Fitness. Some of the existing dumbbells will remain in place to allow for two sets and the higher weights.
- A new punchbag for the studio has been ordered.
- A new plate-loaded preacher machine is on order.
Additionally, we are currently awaiting quotes for a plate-loaded chest press and shoulder press machine, which will be added to the equipment list.
Pool Update:
The pool is currently maintaining a temperature of 30 degrees. We are actively working on improving the Air Handling Units to ensure that the air temperature poolside is maintained during the colder months.