26/06/2025
Patient wishes to replace missing teeth and generally fix everything.
We planned 2 implants using the DS workflow. Prime scans were overlaid with CBCT image on Axeos including a waxup. DS Core makes this process so much easier now.
I produced a guide to give me a pilot only for positioning in the arch. Osteotomies were completed free hand after that using the Versah bur series. The distal osteotomy required a crestal sinus lift. Puros from Zimvie was expelled through the osteotomy into the sinus space lifting the membrane.
Prime Taper implants were placed with excellent insertion torque.
Heal Design abutments seated and a roll flap of the palatal incision to bulk out those tissues.
See you in 4 months to put some teeth on!