23/02/2026
Zenith Way, Orion Industrial Park | Civil Works
Soak wells are currently being installed as part of the stormwater management system at our Zenith Way project.
This critical underground infrastructure ensures the site meets engineering and drainage requirements, supporting long-term performance of the development.