28/02/2026
Scorpius Road, Orion Industrial Park | Tilt Panels Curing
Concrete tilt-up panels are now curing following casting at our Scorpius Road project.
This phase allows the panels to reach their required strength before lifting and installation begins — the point where the building will rapidly take shape above ground.